The fountain is being rebuilt from the ground up over the winter. It needed a total recast of the base and replacement of the plumbing system. It is set to be ready for graduation 2025.
BBrown1313
1 posts
The fountain is being rebuilt from the ground up over the winter. It needed a total recast of the base and replacement of the plumbing system. It is set to be ready for graduation 2025.